Building legalization in Estonia: is the use permit in the register?

Check for free what the Estonian building register says about a building — use permit, construction work and procedures in progress. The result in a few seconds.

Check a property

or

What the result means

Every line is a fact from the building register with its date. The check is not legal advice.

Green

The register holds a use permit or use notice, and no unfinished construction work or open procedure was registered after it.

Yellow

Documents exist, but something needs checking:

  • No use permit in the register; building registered before 2003
  • Construction work registered after the last use document: … …
  • Procedure in progress: … … …
  • Use permit application refused …
  • Use permit application granted …; the permit is not linked to this building
  • Register note: “…”
Red

According to the register the building is not ready for a sale:

  • Building status in the register: …
  • Use permit revoked …
  • No use permit or use notice in the register
  • Building not found in the register

How legalization works

  1. Check

    Enter an address or a cadastral number and see what the building register says about the building.

  2. Partner’s assessment

    A legalization partner reviews the result and the property and tells you what needs to be done.

  3. Documents and procedure

    Where needed: a survey, a building design and an application to the local municipality.

  4. Use permit and the sale

    Once the register is in order, the sale can go ahead with a complete set of documents.

Frequently asked questions

There is no use permit — will the bank give a mortgage?
The bank assesses the collateral and usually also looks at the building register. If the use permit or use notice is missing, or the data does not match reality, the loan decision may be delayed or require legalization before the sale. The bank gives the exact answer; the check shows what the register says now.